Loading guide...
Workshop Walkthrough
A step-by-step animated walkthrough of the 444cc teardown — drain + strip, cam-chain orientation, the three-stage head torque (15 / 24 / 28 N.m), and the K4+ shim-under-bucket valve adjustment at the F-mark position with both pistons at TDC.
Workshop Walkthrough
Watch the on-canvas build first, then run the numbered steps below at the bench. Still frames pin to the matching step in the procedure list.
If the inline player will not start, download the walkthrough (MP4).
Family reference
Loading guide...