Loading guide...
Workshop Walkthrough
A step-by-step animated walkthrough of the CB900F DOHC top-end — drain + strip, cam-chain orientation, the three-stage head torque on the four-cylinder, and the dual-overhead-cam valve clearance setting with the in-line-four firing interval.
Workshop Walkthrough
Watch the on-canvas build first, then run the numbered steps below at the bench. Still frames pin to the matching step in the procedure list.
If the inline player will not start, download the walkthrough (MP4).
Loading guide...